Quick Answer
To hand off a solar install, freeze the signed version, name one receiver, and attach the drawings, equipment list, and open items. That person accepts the package, accepts it with a written limit, or returns it. A text message is not the package. Book a demo to see the record on the job.
How to hand off a solar install is the step after the buyer has a page they signed. The note that keeps an unsigned proposal alive is how to follow up a solar proposal. What that page should contain is how to write a solar proposal. This page is the release. SubcontractorHub is an all-in-one sales and project management platform for solar, roofing, and HVAC contractors. The handoff is a record, not a claim about how fast a crew finishes.
Dropping a PDF in a shared drive does not name who is allowed to build. The office can believe the job moved. The crew lead can believe they are still waiting. Both are looking at a file nobody accepted.
The release has two sides. Sales states the version, the equipment, and the items still open. The receiver says accepted, accepted with a limit, or returned. A signature on a blank “received” line does not show what was checked. Write the limit in a sentence: roof work still open, main-panel photo missing, or utility application not filed.
The release is finished only when that answer sits on the job. A calendar hold, a color on a whiteboard, or a rep saying the office already sent it is not the answer. If the named person is out, write the backup in the same note and keep one date. Two threads about the same roof are how the warehouse orders the rail from the older page.
Write these down before anyone is scheduled. If a line is blank, the package is not ready to accept.
Production stays the model already printed on the proposal. Do not let the handoff invent a new kilowatt-hour promise, a tax-credit percentage, or a utility rate. If the design changed, the buyer needs the new version before the crew treats it as the job.
Use the step that matches the file. There is no national number of days that makes a sold job ready. Cities, utilities, and roof conditions differ.
That sequence lives on the job in project management, next to the document built in solar proposal software. The solar platform is the place those two records should meet. This is a claim about where the package sits, not about a cycle time.
A return is a complete handoff, not a failure of nerve. The reason has to be specific. “Not ready” is not specific. “The main breaker rating is not in the photos” is specific. The sender then adds that photo or says the design will change.
Accepted with a limit is how you release part of the work. The receiver might accept the racking layout and refuse to order a battery that is still a verbal add. Write the limit on the package. Do not leave it in a side chat that the warehouse never sees.
Say who files the permit and who files interconnection. Those are owners, not moods. An open utility question does not have to block every task. It does have to be visible, with a date, so nobody tells the household the system can be turned on.
Permission to operate is a later gate. Do not mark the handoff complete because a truck was booked. The crew package and the utility's permission are different records. Mix them and the office will argue about a job that is installed and still not allowed to run.
A soft deck, a panel that is not the one in the photo, or a shade tree the survey skipped is a return or a revision. The crew should not invent a layout in the driveway and text it to sales as the new design. The revision goes back through the same version the buyer can see.
Change orders after acceptance are a different document from the original package. Keep them attached to the job. A verbal “while you are up there” is how the invoice and the signed page stop matching. The weekly review is the list of packages with no answer and revisions with no date.
A dealer whose engineer already issues a controlled drawing set, with its own revision rule, should keep that rule. This page does not replace a structural judgment, an electrical design, or a utility's form. It is the habit of naming the receiver. Companies that only sell and never install still need a receiver at the partner who will build. The sales pipeline should stop calling the job “sold, details later.”
The signed version, the address, the equipment that was sold, the drawings the receiver is supposed to build from, the open items, and the name of the person who can accept or return the package. A proposal PDF with no receiver is not a handoff.
The rep can stay a contact. The receiver of the install package has to be a named person who can accept the file or send it back. Two owners and no date is how a sold job sits.
No. A site survey is the field evidence collected before or during design. The handoff is the release of a specific version to a specific person. Photos without a receiver are still just photos.
Re-issue the version and say what changed. Do not leave the crew on the old page while a text message describes a different system. The receiver should be able to return a package that no longer matches the site.
When the named receiver accepts the package, or returns it with a reason. A file dropped in a shared folder with no acceptance is still in transit.
See the signed version, the open items, and the person who accepted the package. Book a demo and walk a live install record.
Book a DemoSubcontractorHub
AI proposals, sales pipeline, and project management — all in one platform.
30 minutes. No commitment.